Groundplan Virtual Assistant: the takeoff counted before you sit down to price it
For electrical, plumbing, HVAC, fire, security and data contractors whose tender pile grows faster than the estimator can count, and whose estimator is usually the owner.
30 minutes with Jenn, the founder. No card, no lock-in.
What your VA actually does inside Groundplan
Plan preparation and scaling
Tender sets downloaded, uploaded to Groundplan and organised by sheet and level, then each drawing calibrated against a dimension you trust and sanity-checked against a second one, so every count that follows is measured on a sheet that is telling the truth.
Symbol counts
Downlights, GPOs, detectors, sprinkler heads, cameras and data points counted off the drawings with Groundplan's 500+ trade symbol library, one symbol and colour per fitting type under your markup conventions, so the count is auditable on screen rather than a number in someone's head.
Length and area takeoffs
Cable runs, conduit, pipework and duct measured with the length tools, areas taken where the job needs them, and the takeoff split by level or stage so quantities land against the right part of the job instead of one undifferentiated total.
Kits and price list upkeep
Your kits kept matched to how you build, and supplier pricing updated when new price files land, so a counted symbol carries current material and labour content instead of last winter's numbers.
Drawing revisions
When the consultant issues a new revision mid-tender, the VA loads it, re-runs the counts on the affected sheets, and hands you a note of what moved, so a revision becomes a half-hour check instead of a full recount.
Export into your job platform
Finished takeoffs pushed through to simPRO or AroFlo, or exported to spreadsheet where that is your workflow, then checked at the other end so the quantities that arrive in your quoting screen are the quantities that were counted.
Markup standards and takeoff records
Your colour and symbol conventions written down and applied the same way on every job, and completed takeoffs filed against the tender, so any count can be pulled up and defended weeks later when a builder queries it.
There is a particular pile on every contractor’s desk, physical or digital, and it is the tender sets nobody has counted yet. Groundplan was supposed to fix that, and in one sense it did: 8,000+ AU and NZ contractors now measure and count off PDF plans in a browser instead of scaling paper with a wheel and a clicker. The counting got faster. What did not change is who does it. If you are the estimator and the owner and occasionally the person on the tools, Groundplan just moved the backlog from the plan tube to a tab you feel guilty about.
Searching “groundplan virtual assistant” usually means one specific thing: you have more tenders than counting hours, hiring a local estimator is a $90k+ decision you are not ready for, and you have realised that a big share of estimating time is not judgement at all. It is measurement. Measurement can be delegated.
That split is worth being precise about, because it is the whole logic of the placement. An estimator’s tender hours divide into two very different kinds of work. One kind is judgement: reading the spec, spotting the risk, setting the rates, deciding the margin. The other kind is production: calibrating sheets, counting fittings, tracing runs, zoning quantities, exporting results. The production half eats most of the clock, and it is the half that does not need your licence, your scars or your relationship with the builder. It needs someone careful, consistent and trained on your conventions. That is the job description of a good VA.
The daily rhythm a VA runs in your Groundplan
The work starts before any counting does. New tender documents get pulled down, loaded into Groundplan and sorted by sheet and level, and each drawing gets calibrated: scale set against a dimension you trust, then checked against a second one, because a sheet that lies about its scale poisons every number taken off it. Ten unglamorous minutes per set, and the single most common source of takeoff error is gone before it starts.
Then the counts. This is where Groundplan’s 500+ trade symbol library earns its keep: downlights, GPOs, switches, smoke and thermal detectors, sprinkler heads, cameras, data points, each fitting type given its own symbol and colour under the markup conventions your estimator sets. The convention part matters more than it sounds. A takeoff where every system has its own colour and every count is a visible symbol on the drawing is one your estimator can audit in minutes, and defend when a builder queries a number three weeks later. A count that lives in someone’s head is neither.
Lengths and areas follow: cable runs, conduit, pipework and duct traced with the measuring tools, quantities zoned by level or stage so they land against the right part of the job. Where your setup uses kits, the counted symbol carries its material and labour content with it, which is also why the VA keeps kits and supplier pricing current in the background. A perfect count attached to a stale price file is a quietly wrong estimate.
Mid-tender revisions are their own small ritual. Consultants issue a Rev C four days before close, and in most one-person estimating operations that means a groan and a recount. A VA loads the new sheets, re-runs the counts where things moved, and gives you a short note on what changed, so the revision costs you a review, not an evening.
Last leg: the handover. Groundplan is measurement software, not job management, and the standard AU pairing pushes the finished takeoff into simPRO or AroFlo where your catalogue, rates and jobs already live. The VA runs that export and then verifies it landed intact, line for line, because the gap between two integrated systems is exactly where a mystery quantity likes to disappear. If your workflow runs on spreadsheets instead, the export goes there, formatted the way your pricing sheet expects.
Around the takeoffs sits the tender admin that estimating businesses rarely give anyone: a register of what is out, what closes when, which addenda have landed and which takeoffs are done, in review or blocked on a question back to the consultant. Because the VA works Australian business hours from Manila, that register moves during your day, not overnight: a question about a missing dimension gets asked at 9am and answered before the afternoon, instead of sitting in an inbox across a time zone gap. By close week, you are pricing counted jobs in deadline order rather than triaging which drawings to open first.
The honest bit
Three things worth saying plainly.
First, Groundplan cannot rescue a bad drawing, and neither can the VA. A low-resolution scan, a sheet with no reliable dimension to calibrate against, a markup-heavy PDF that hides the fittings: the right response is to flag it back to you, and that is what the VA is trained to do. A confident count off an untrustworthy sheet is worse than no count.
Second, a takeoff is not an estimate. Groundplan compresses the measuring, but the number that goes on the tender still needs wastage allowances, labour judgement, supplier terms and a margin, and those are estimating decisions no matter who runs the mouse. If you are hoping a VA turns tenders into finished prices end to end, this page is not going to pretend that. What the arrangement does is strip most of the production time out of each tender so your judgement is applied to counted quantities instead of raw drawings.
Third, the talent pool. Groundplan is an AU/NZ product with a smaller offshore footprint than the global platforms, so a candidate with existing Groundplan hours is a bonus, not a promise. What transfers reliably is plan literacy and the temperament for exact, repetitive measurement, and the tool itself is genuinely quick to learn. Your conventions are the real curriculum, which is why the supervised fortnight exists and why the VA documents your markup rules as they learn them, so the standard survives beyond one person’s memory.
What stays with you
Everything that carries tender risk. The decision to bid. Labour rates and production allowances. Wastage percentages. Supplier and subcontract pricing calls. Margin. The buildability read of the drawing, the undersized board, the duct that will not fit the ceiling space, the clash a counted symbol will never reveal. And the final review of quantities on any job where an error is expensive, which the colour-coded, on-screen takeoff makes a fast job rather than a leap of faith.
The seat structure backs this up. Groundplan licenses per user, so the VA works under their own login in your workspace, every markup attributed to the person who made it, with your estimator able to open the live takeoff at any point rather than waiting on a returned file. The pricing layer of your business, whether that is simPRO’s sell rates or your own spreadsheet, simply never becomes the VA’s territory.
In practice the review settles into a rhythm of its own. Early placements get a full check: every sheet opened, counts spot-verified against the symbols on screen, lengths eyeballed against the drawing. As the VA’s error rate proves itself, most estimators drop to a sampling review plus a hard look at anything unusual, the odd riser diagram, the sheet where the consultant got creative with symbols, the zone where a count moved sharply between revisions. The on-screen audit trail is what makes that possible: you are not re-measuring, you are checking visible work.
What it costs and where to start
Plan preparation, price list upkeep and straightforward counting sit on the admin tier at $12-17 AUD an hour excl GST. Full takeoffs, run to your markup rules across multi-sheet tender sets, are specialist work at $18-25, and that is where most Groundplan placements settle. Ten to fifteen hours a week covers a steady tender flow for most electrical, plumbing, HVAC, fire and security contractors. Budget one more line: Groundplan’s own per-user licence for the VA’s seat.
Placement runs 7-10 business days from the discovery call, followed by 5-7 supervised days inside your workspace where your estimator signs off every takeoff before anything goes solo. The $500 deposit is refundable and credits to your first month, the 30-day guarantee means we recalibrate or replace if the fit is wrong, and there is no lock-in beyond 14 days notice.
For the wider picture, the electricians page covers how a VA fits a sparky business beyond estimating, and quote preparation covers the workflow this feeds. If Groundplan hands off to your job platform, the simPRO and AroFlo pages cover that half of the same placement, and the VA cost guide breaks the tiers down properly.
Or book a discovery call with Jenn, who has placed 87+ VAs into Australian businesses since 2024 and will say so plainly if takeoff work is not the right first delegation for you. Bring a recent tender set and an honest guess at the hours it took to count. That number is usually the whole business case.
Industries that run on Groundplan
The tasks this usually covers
Groundplan VA questions
Can a virtual assistant genuinely run a takeoff in Groundplan?
The measuring and counting half, yes, and that is most of the clock time. Groundplan turned takeoff into structured screen work: calibrate the sheet, pick the symbol, count the fittings, run the lengths, keep each system in its own colour. That is careful, repeatable work a trained VA does well, provided the rules are written down: which symbols map to which fittings, how risers are treated, what gets zoned by level. What a VA does not bring is a tradesperson's read of the drawing. They will not notice the switchboard that is undersized for the load or the ceiling space that will not fit the duct. They produce a clean, auditable count; your estimator reviews it and prices it.
Will the VA already know Groundplan, or am I training them from scratch?
Straight answer: Groundplan is an AU/NZ product, so the offshore pool of VAs with direct Groundplan hours is thinner than for global platforms, and we will tell you that on the discovery call rather than let you find out later. What we match for is the underlying skill: careful measurement work, plan literacy, attention to detail across hundreds of repeated counts. The tool itself is learnable in days; your conventions are the harder part, which is why every placement runs 5-7 supervised days inside your workspace, starting on plan preparation and simple counts, before anything is done solo. Your estimator signs off each takeoff during that period and decides when the training wheels come off.
Does the takeoff flow into simPRO or AroFlo, and does the VA handle that?
Yes on both. Pairing Groundplan with simPRO or AroFlo is the standard AU setup: measure and count in Groundplan, then push the takeoff across so quoting happens in the platform that already holds your catalogue and your jobs. The VA runs that export and then checks the result at the other end, because an integration you trust blindly is how a quantity goes missing between systems. If the same VA also works inside your job platform day to day, that is a natural pairing; we run separate pages on the simPRO and AroFlo side of the placement.
Will the VA price my tenders?
No, and we would talk you out of it if you asked. The VA's output is quantities: fittings counted, metres measured, kits attached, everything zoned and exported. Labour rates, wastage allowances, supplier terms, margin and the decision to tender at all are estimating judgement, and they stay with whoever carries the risk of getting them wrong. That split is not a limitation of the VA, it is the design: your estimator's hours stop going into counting downlights and start going into the calls only they can make.
What does a Groundplan virtual assistant cost?
Plan preparation, price list upkeep and straightforward symbol counts sit on the admin tier at $12-17 AUD an hour excl GST. Full takeoffs run to your markup rules across multi-sheet tenders are specialist work at $18-25, and most Groundplan placements land there. A typical engagement is 10-15 hours a week, roughly $500-1,100 a month at admin rates. The $500 deposit is refundable and comes off your first month, the first 30 days carry a recalibrate-or-replace guarantee, and leaving is 14 days notice. Remember Groundplan itself licenses per user, so the VA's seat is a line on your software bill as well as ours.
Book a free discovery call
30 minutes with me, the founder. Tell me you run Groundplan and what's eating your week, and I'll tell you honestly what a VA can own inside it, what it costs, and whether it makes sense.
1. Tell us what Groundplan work to take off your plate. 2. Pick a call time that suits. 3. Meet your shortlist of 3-5 matched VAs, usually inside 7-10 business days.
87+ Australian placements since 2024, a 30-day replacement guarantee and no lock-in beyond 14 days notice. Audit the 5-stage vetting process and how VA access is secured before you book.
Step 2 of 2
One step left: pick your time
Your details are with Jenn, but the call is not in her diary yet. Pick a time and it is locked in, about 20 seconds. Within 48 hours of the call you will have a written recap: the tasks we would delegate first, an indicative cost and a timeline.
Pick a time with Jenn now →Nothing that suits? Call (03) 9961 6076 and we will book it around you. Or leave it and Jenn will email you within one business day.
Looking for a VA job?
This form books a call with our client team.
It won't reach our hiring team, so it can't book you an interview. DotVA hires virtual assistants from the top 1% through a separate application system. If you think that's you, apply there with your resume, a short video and (if you have one) a little portfolio.
Apply at apply.dotva.com.au →Actually a business looking to hire a VA? Call (03) 9961 6076 or email [email protected] and we will sort it out.
Not ready for a call? Get an instant cost estimate (2 minutes, no email needed) or check if you are ready in 90 seconds.
VAs for other software & platforms